On Day 0 dated 9/11/2022, left Bengaluru and travelled to Supa Dam Hydro power plant, dandeli.
On Day 1 dated 10/11/2022 reached Supa Dam Hydro power plant, dandeli and technical specifications of plant are 2 units of 50MW, total Capacity of 100MW is generated.
Type of Turbine usage is Vertical Fracis, design head of 72m height, turbine speed of 200rpm. Evening time visited nearby places on the bank of Kali water reservoir and played water sport games like 1. Kayaking 2. White Water Rafting 3. Zorbing 4. Cycling 5. Jungle Trekking 6. Ziplining 7. Mountain climbing etc.